Brazil

ENERGO–PRO Brazil Ltda. was established in August 2023 and its main activities are identification of suitable hydropower assets in the country. In the end of November 2024, the company acquired seven small hydropower plants in Brazil from investment vehicles managed by Brookfield Asset Management. The total installed capacity of these plants reaches 90 MW.

Market entry

2023

Number of employees

4

HPP Verde 4

History

The HPP was put into operation in 2019, and the concession is valid till 2049. It is located in the state of Mato Grosso do Sul in the Ribas do Rio Pardo e Águas Claras city on the river Rio Verde.

Type of power plant

With reservoir

Installed capacity

19 MW

Annual electricity production

88 GWh

HPP Verde 4A

History

The HPP was put into operation in 2018, and the concession is valid till 2049. It is located in the state of Mato Grosso do Sul in the Ribas do Rio Pardo city on the river Rio Verde.

Type of power plant

With reservoir

Installed capacity

28 MW

Annual electricity production

139 GWh

HPP Cristina

History

The HPP was put into operation in 2011, and the concession is valid till 2032. It is located in the state of Minas Gerais in the Cristina city on the river Lambari.

Type of power plant

With reservoir

Installed capacity

3.8 MW

Annual electricity production

11 GWh

HPP Zé Tunin

History

The HPP was put into operation in 2019, and the concession is valid till 2049. It is located in the state of Minas Gerais in the Guarani city on the river Rio Pomba.

Type of power plant

With reservoir

Installed capacity

8 MW

Annual electricity production

32 GWh

HPP São Sebastião do Alto

History

The HPP was put into operation in 2011, and the concession is valid till 2048. It is located in the state of Rio de Janeiro in the São Sebastião do Alto e Santa Maria Madalena city on the river Rio Grande.

Type of power plant

With reservoir

Installed capacity

13.2 MW

Annual electricity production

52 GWh

HPP Caju

History

The HPP was put into operation in 2011, and the concession is valid till 2048. It is located in the state of Rio de Janeiro in the São Sebastião do Alto e Santa Maria Madalena city on the river Rio Grande.

Type of power plant

With reservoir

Installed capacity

10 MW

Annual electricity production

44 GWh

HPP Santo Antonio

History

The HPP was put into operation in 2012, and the concession is valid till 2049. It is located in the state of Rio de Janeiro in the Bom Jardim city on the river Rio Grande.

Type of power plant

With reservoir

Installed capacity

8 MW

Annual electricity production

36 GWh

Company

ENERGO PRO Brazil Ltda.


Address

Av. Brig. Faria Lima, 3311, 9º andar